252.228-7001

Ground and Flight Risk.
Search on acquisition.gov · View on eCFR.gov
Effective Date
MAR 2023
Active Deviations
2
Versions
2 (since 2016-12-22)
DEV
This clause is modified by 2 active class deviations
  • 2026-O0032 — DFARS RFO Implementation (Part 31)
    Add clause 252.228-7001
  • 2026-O0005 — DFARS RFO Implementation (Part 28)
    Add clause 252.228-7001
View per-deviation details →
252.228-7001 Ground and Flight Risk.

As prescribed in 228.371(b), use the following clause:

Ground and Flight Risk (MAR 2023)

(a)
Definitions.
As used in this clause—

Aircraft
means, unless otherwise provided in the contract Schedule, any item, other than a rocket or missile, intended for flight (
e.g.,
fixed-winged aircraft, blended wing/lifting bodies, helicopters, vertical take-off or landing aircraft, lighter-than-air airships, and unmanned aerial vehicles), including emerging technologies that would commonly be considered aircraft. New production articles become aircraft at a stage of manufacture or production when a wing, portion of a wing, or engine is attached to a fuselage. Blended wing/lifting bodies become aircraft at a stage of manufacture or production when the center portion and a lifting surface become attached.

Contractor's managerial personnel
means the Contractor's directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of—

(1) All, or substantially all, of the Contractor's business;

(2) All, or substantially all, of the Contractor's operation at any one plant or separate location; or

(3) A separate and complete major industrial operation.

Contractor's premises
means those premises, including subcontractors' premises, designated in the Schedule or in writing by the Contracting Officer, and any other place the aircraft is moved for safeguarding.

Covered aircraft
means an aircraft owned by or to be delivered to the Government and, when determined by the contracting officer and specifically identified as such in the contract Schedule, may include contractor-furnished aircraft that are not intended for induction into the DoD inventory, including—

(1) Aircraft furnished by the Government to the Contractor under this contract while in the Contractor's possession, care, custody, or control regardless of their location or state of disassembly or reassembly;

(2) Items removed from a Government furnished aircraft that are—

(i) Intended for reinstallation on that particular aircraft, which retain their status as covered aircraft while awaiting installation; and

(ii) Not intended for reinstallation on that particular aircraft, which lose their status as covered aircraft once removal is complete;

(3) New production aircraft when wholly outside of buildings on the Contractor's premises or other places described in the Schedule (
e.g.,
hush houses, run stations, and paint facilities); and

(4) Commercial aircraft, to include commercially available off-the-shelf aircraft, become covered aircraft when the commercial aircraft arrives at the Contractor's place of performance for modification under the terms of the contract.

Crewmember
means, unless otherwise provided in the Schedule, personnel required in the flight manual, assigned for the purpose of conducting any flight on behalf of the Contractor. It also includes any operator of an unmanned aerial vehicle.

Flight
means any flight approved in writing by the Government flight representative, to include taxi test made in the performance of this contract, or flight for the purpose of safeguarding the aircraft. All aircraft off the Contractor's premises shall be considered to be in flight when on the ground or water for reasonable periods of time following emergency landings, landings made in performance of the contract, or landings approved in writing by the contracting officer.

Workmanship error
means damage to the aircraft that is the result of an incorrectly performed skill-based task, operation, or action that was originally planned or intended.

(b)
Combined regulation/instruction.
The Contractor shall be bound by the operating procedures contained in the combined regulation/instruction entitled "Contractor's Flight and Ground Operations" (Air Force Instruction 10-220, Army Regulation 95-20, NAVAIR Instruction 3710.1 (Series), Coast Guard Instruction M13020.3 (Series), and Defense Contract Management Agency Instruction 8210-1 (Series) in effect on the date of contract award. Compliance with the combined regulation/instruction is required from the time of contract award throughout the period of performance of the contract, regardless of the Government's assumption of risk under the contract.

(c)
Government as self-insurer.
The Government self-insures and assumes the risk of damage to, or loss or destruction of, covered aircraft subject to the following conditions:

(1) The Contractor's liability to the Government for damage, loss, or destruction of covered aircraft is limited to the Contractor's share of loss as defined at paragraph (h) of this clause, except when one of the exclusions at paragraph (d) applies.

(2) The liability provisions of this clause take precedence over the liability provisions of Federal Acquisition Regulation (FAR) clause 52.245-1, Government Property, with respect to covered aircraft.

(3) The Contractor is not liable for loss, damage, or destruction of covered aircraft as the result of normal wear and tear, or intentional damage or destruction as required in the Schedule.

(4) Conditions for Government assumption of risk in flight are as follows:

(i) The Contractor's crewmembers are approved in writing by the Government flight representative (GFR).

(ii) The flight is approved in writing by the GFR.

(d)
Exclusions from the Government's assumption of risk.
The Government's assumption of risk under this clause shall not extend to damage, loss, or destruction of covered aircraft which—

(1) Is the result of willful misconduct or lack of good faith on the part of the Contractor's managerial personnel, including the Contractor's oversight of subcontractors;

(2) Is sustained during flight if either the flight or the crewmembers have not been approved in advance and in writing by the GFR, who has been authorized in accordance with the combined regulation/instruction entitled "Contractor's Flight and Ground Operations";

(3) Occurs in the course of transportation by rail, or by conveyance on public streets, highways, or waterways, unless the transportation is limited to the vicinity of the Contractor's premises, and incidental to work performed under the contract as described in the Schedule;

(4) Is covered by insurance;

(5) Occurs after the Contracting Officer has, in writing, revoked the Government's assumption of risk in accordance with paragraph (e)(3) of this clause; or

(6) Is sustained due to workmanship errors.

(e)
Revoking the Government's assumption of risk.

(1) The Contracting Officer, when finding that the Contractor's managerial personnel have failed to comply with paragraph (b) of this clause, will issue a preliminary notice of revocation requiring the Contractor to comply with contract requirements within a timeframe specified by the Contracting Officer. In determining exposure to unreasonable conditions, the Contracting Officer will consider factors including, but not limited to, the following: lack of adequate hangar fire suppression or firefighting vehicles, failure to provide adequate procedures to the GFR, or systemic failure to comply with approved procedures.

(2) Upon receipt of the preliminary notice of revocation, the Contractor shall promptly correct the noncompliance or cited conditions, regardless of whether there is agreement that the conditions are unreasonable.

(3) If the Contracting Officer finds that the Contractor failed to correct the cited noncompliance or conditions within the specified timeframe, the Contracting Officer will issue a notice of revocation of the Government's assumption of risk for any covered aircraft.

(4) If the Contracting Officer issues a notice of revocation pursuant to the terms of this clause—

(i) The Contractor shall thereafter assume the entire risk for damage, loss, or destruction of the previously covered aircraft;

(ii) Any costs incurred by the Contractor (including the costs of the Contractor's self-insurance, insurance premiums paid to insure the Contractor's assumption of risk, deductibles associated with such purchased insurance, etc.) to mitigate its risk are unallowable costs; and

(iii) The liability provisions of the clause at FAR 52.245-1, Government Property, are not applicable to the aircraft impacted by the notice of revocation.

(5) The Contractor shall promptly notify the Contracting Officer when the noncompliance or cited conditions have been corrected. Within 3 days of receipt of the Contractor's notice of correction, the Contracting Officer will notify the Contractor whether the Government will resume risk of loss. The Contracting Officer will determine that the noncompliance or cited conditions have been corrected prior to resuming assumption of risk.

(6) The notice of revocation does not relieve the Contractor of its obligation to comply with all other provisions of this clause, including the combined regulation/instruction entitled "Contractor's Flight and Ground Operations."

(7) Any disputes regarding the Contracting Officer's notice of revocation shall be subject to FAR clause 52.233-1, Disputes.

(f)
Contractor's exclusion of insurance costs.
The Contractor warrants that the contract price does not and will not include, except as may be authorized in this clause, any charge or contingency reserve for insurance (including the Contractor's share of loss) covering damage, loss, or destruction of covered aircraft when the risk has been assumed by the Government, even if the assumption may be terminated for covered aircraft.

(g)
Procedures in the event of damage, loss, or destruction.

(1) In the event of damage, loss, or destruction of covered aircraft, the Contractor shall take all reasonable steps to protect the aircraft from further damage, to separate damaged and undamaged aircraft, and to put all aircraft in the best possible order. Except in cases covered by paragraph (h)(2) of this clause, the Contractor shall furnish to the Contracting Officer a statement of—

(i) The damaged, lost, or destroyed aircraft;

(ii) The time and origin of the damage, loss, or destruction;

(iii) All known interests in commingled property of which aircraft are a part; and

(iv) The insurance, if any, covering the interest in commingled property.

(2) If a new production aircraft is damaged, lost, or destroyed before it has become a covered aircraft, the Government bears no responsibility for risk of loss.

(3) If a new production aircraft is damaged, lost, or destroyed after it has become a covered aircraft, the Contractor shall take action in accordance with the Contracting Officer's written direction that the aircraft shall be—

(i) Replaced;

(ii) Repaired to the condition immediately prior to the damage; or

(iii) Considered beyond economic repair. The Contracting Officer will decide whether further actions are required under the contract.

(4) If a covered aircraft that has been furnished by the Government to the Contractor is damaged, lost, or destroyed while covered, the Contractor shall take action in accordance with the Contracting Officer's written direction that the aircraft shall be—

(i) Repaired; or

(ii) Considered beyond economic repair. The Contracting Officer will decide further actions required under the contract.

(5) The Contracting Officer will make an equitable adjustment for expenditures made in performing the obligations under this paragraph (g).

(h)
Contractor's share of loss.

(1) The Contractor's share of loss or damage to covered aircraft, except for loss or damage caused by negligence of Government personnel, is the least of—

(i) $200,000;

(ii) 20 percent of the price or estimated acquisition cost of affected aircraft; or

(iii) 20 percent of the price or estimated cost of the contract, task order, or delivery order.

(2) If the Government requires covered aircraft be replaced or repaired by the Contractor, any resulting equitable adjustment shall not include reimbursement of the Contractor's share of loss.

(3) In the event the Government does not decide to replace or repair, the Contractor agrees to credit the contract price or pay the Government, as directed by the Contracting Officer, the least of—

(i) $200,000;

(ii) 20 percent of the price or estimated acquisition cost of affected aircraft; or

(iii) 20 percent of the price or estimated cost of the contract, task order, or delivery order.

(4) The costs incurred by the Contractor for its share of the loss and for insuring against that loss are unallowable costs, including but not limited to—

(i) The Contractor's share of loss under the Government's self-insurance;

(ii) The costs of the Contractor's self-insurance;

(iii) The deductible for any Contractor-purchased insurance;

(iv) Insurance premiums paid for Contractor-purchased insurance; and

(v) Costs associated with determining, litigating, and defending against the Contractor's liability.

(i)
Reimbursement from a third party.
In the event the Contractor is reimbursed or compensated by a third party for damage, loss, or destruction of covered aircraft and has also been compensated by the Government, the Contractor shall equitably reimburse the Government. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for damage, loss, or destruction. Upon the request of the Contracting Officer or authorized representative, the Contractor shall at Government expense furnish to the Government all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment or subrogation) in obtaining recovery.

(j)
Liability to third parties.
Unless the flight and crewmembers have been approved in writing by the GFR, the Contractor shall not be reimbursed for liability to third parties for loss or damage to property or for death or bodily injury caused by covered aircraft during flight, even if the Government has accepted such liability under any other provisions of the contract.

(k)
Subcontracts.
The Contractor shall incorporate the requirements of this clause, including this paragraph (k), in subcontracts to include subcontracts for commercial products and commercial services, except—

(1) The Contractor shall not include paragraph (f) of this clause in subcontracts for commercial products or commercial services; and

(2) The Contractor shall not incorporate the requirements of this clause in subcontracts with Federal Aviation Administration (FAA) part 145 repair stations performing work pursuant to their FAA license.

(End of clause)

[88 FR 17352, Mar. 22, 2023]
RFO
Prescription superseded under the RFO

The prescription shown below is from the codified eCFR. The Revolutionary FAR Overhaul relocates this clause's prescription as follows:

  • 228.370-2228.370-3 (prescriptive text also revised)
  • 228.370-3PGI 228.370-2 (prescriptive text also revised)

See the deviation memorandum for the current prescription authority.

View deviation: 2026-O0032 → · View deviation: 2026-O0005 →

R-DFARS Prescription Source

This clause is prescribed in the R-DFARS by the following deviations:

  • 2026-O0032 — DFARS RFO Implementation (Part 31) (DFARS Part 231)
    Add clause 252.228-7001
  • 2026-O0005 — DFARS RFO Implementation (Part 28) (DFARS Part 228)
    Add clause 252.228-7001
228.371(b)
(b) Use the clause at 252.228-7001 , Ground and Flight Risk, in solicitations and contracts-
(1) For the acquisition, development, production, modification, maintenance, repair, flight, or overhaul of aircraft owned by or to be delivered to the Government, except those solicitations and contracts
(i) That are strictly for activities incidental to the normal operations of the aircraft (e.g., refueling operations, minor non-structural actions not requiring towing such as replacing aircraft tires due to wear and tear);
(ii) That are awarded for purchase under FAR part 12 procedures;
(iii) For which a non-DoD customer (including an FMS customer per 225.7305) has decided to allow the use of commercial insurance or other self-insurance; has not agreed to assume the risk for loss or destruction of, or damages to, the aircraft; or
(iv) For commercial derivative aircraft with an FAA certificate of airworthiness maintained to FAA standards. when the work will be performed at a licensed FAA repair station. Performance under the exception in this paragraph (b)(1)(iv) must be at a licensed and certified FAA repair station rated for the type of aircraft and work to be maintained. This exception does not apply to contracts requiring flights with contractor crewmembers;
(v) Under which the aircraft are to be dismantled and removed from the inventory; or
(vi) Under which the aircraft are classified as Group 1 or 2 unmanned aircraft systems per DoD Instruction (DoDI) 6055.07, Mishap Notification, Investigation, Reporting, and Record Keeping, and the purchase price of the air vehicle, including installed Government-furnished equipment, is below the cost threshold for a Class C mishap per DoDI 6055.07; or
(2) Involving aircraft not owned by or to be delivered to the Government, only if the contracting officer determines that it is in the best interest of the Government. See 228.370-3.
Prescription data sourced from eCFR as of 2026-06-10 03:16 UTC. Cross-references within the prescription are not resolved automatically.

Regulatory Stack

The layers of regulation that govern this clause, from the FAR prescription through agency-specific supplements and any active deviations.

R-DFARS R-DFARS Prescription Per Deviation 2026-O0032 (DFARS Part 231/228)
2026-O0032: DFARS RFO Implementation (Part 31) — DFARS Part 231
2026-O0005: DFARS RFO Implementation (Part 28) — DFARS Part 228

View Deviation 2026-O0032 → · View Deviation 2026-O0005 →

DFARS DFARS Supplement (eCFR) ⚠ May be superseded by RFO 228.371(b)
(b) Use the clause at 252.228-7001 , Ground and Flight Risk, in solicitations and contracts-
(1) For the acquisition, development, production, modification, maintenance, repair, flight, or overhaul of aircraft owned by or to be delivered to the Government, except those solicitations and contracts
(i) That are strictly for activities incidental to the normal operations of the aircraft (e.g., refueling operations, minor non-structural actions not requiring towing such as replacing aircraft tires due to wear and tear);
(ii) That are awarded for purchase under FAR part 12 procedures;
(iii) For which a non-DoD customer (including an FMS customer per 225.7305) has decided to allow the use of commercial insurance or other self-insurance; has not agreed to assume the risk for loss or destruction of, or damages to, the aircraft; or
(iv) For commercial derivative aircraft with an FAA certificate of airworthiness maintained to FAA standards. when the work will be performed at a licensed FAA repair station. Performance under the exception in this paragraph (b)(1)(iv) must be at a licensed and certified FAA repair station rated for the type of aircraft and work to be maintained. This exception does not apply to contracts requiring flights with contractor crewmembers;
(v) Under which the aircraft are to be dismantled and removed from the inventory; or
(vi) Under which the aircraft are classified as Group 1 or 2 unmanned aircraft systems per DoD Instruction (DoDI) 6055.07, Mishap Notification, Investigation, Reporting, and Record Keeping, and the purchase price of the air vehicle, including installed Government-furnished equipment, is below the cost threshold for a Class C mishap per DoDI 6055.07; or
(2) Involving aircraft not owned by or to be delivered to the Government, only if the contracting officer determines that it is in the best interest of the Government. See 228.370-3.

Search on acquisition.gov · View on eCFR.gov

Version History

Version history is sourced from the codified eCFR. Changes published only as class deviations or by the Revolutionary FAR Overhaul do not appear here until they are incorporated into the eCFR. For RFO-driven changes see the RFO Version tab and any active deviations cited above.

2 versions tracked from 2016-12-22 to 2023-03-22.
MAR 2023 March 22, 2023 CURRENT
Removed in this version
Added in this version
Unchanged
DEC 2016 (previous)
MAR 2023 (current)
115 added, 2 removed
(a)
(a) Definitions. As used in this clause -
(a)
(a) Definitions. As used in this clause— Aircraft means, unless otherwise provided in the contract Schedule, any item, other than a rocket or missile, intended for flight (e.g., fixed-winged aircraft, blended wing/lifting bodies, helicopters, vertical take-off or landing aircraft, lighter-than-air airships, and unmanned aerial vehicles), including emerging technologies that would commonly be considered aircraft. New production articles become aircraft at a stage of manufacture or production when a wing, portion of a wing, or engine is attached to a fuselage. Blended wing/lifting bodies become aircraft at a stage of manufacture or production when the center portion and a lifting surface become attached. Contractor's managerial personnel means the Contractor's directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of—
16 added, 50 removed
(1)
(1) Results from failure of the Contractor, due to willful misconduct or lack of good faith of any of the Contractor's managerial personnel, to maintain and administer a program for the protection and preservation of aircraft in the open and during operation in accordance with sound industrial practice, including oversight of a subcontractor's program;
(1)
(1) The Contractor shall not include paragraph (f) of this clause in subcontracts for commercial products or commercial services; and
87 added, 25 removed
(i)
(i) Require that the aircraft be replaced or restored by the Contractor to the condition immediately prior to the damage, in which event the Contracting Officer will make an equitable adjustment in the contract price and the time for contract performance; or
(i)
(i) Reimbursement from a third party. In the event the Contractor is reimbursed or compensated by a third party for damage, loss, or destruction of covered aircraft and has also been compensated by the Government, the Contractor shall equitably reimburse the Government. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for damage, loss, or destruction. Upon the request of the Contracting Officer or authorized representative, the Contractor shall at Government expense furnish to the Government all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment or subrogation) in obtaining recovery.
4 added, 52 removed
(ii)
(ii) Terminate this contract with respect to the aircraft. Notwithstanding the provisions in any other termination clause under this contract, in the event of termination, the Contractor shall be paid the contract price for the aircraft (or, if applicable, any work to be performed on the aircraft) less any amount the Contracting Officer determines -
(ii)
(ii) The costs of the Contractor's self-insurance;
6 added, 13 removed
(iii)
(iii) All known interests in commingled property of which aircraft are a part; and
(iii)
(iii) The deductible for any Contractor-purchased insurance;
7 added, 10 removed
(iv)
(iv) The insurance, if any, covering the interest in commingled property.
(iv)
(iv) Insurance premiums paid for Contractor-purchased insurance; and
26 added, 72 removed
(2)
(2) The Contracting Officer shall prescribe the manner of disposition of the damaged, lost, or destroyed aircraft, or any parts of the aircraft. If any additional costs of such disposition are incurred by the Contractor, a further equitable adjustment will be made in the amount due the Contractor. Failure of the parties to agree upon termination costs or an equitable adjustment with respect to any aircraft shall be considered a dispute under the Disputes clause of this contract.
(2)
(2) The Contractor shall not incorporate the requirements of this clause in subcontracts with Federal Aviation Administration (FAA) part 145 repair stations performing work pursuant to their FAA license. (End of clause)
6 added, 6 removed
(3)
(3) In the event the Government does not elect repair or replacement, the Contractor agrees to credit the contract price or pay the Government, as directed by the Contracting Officer, the lesser of -
(3)
(3) In the event the Government does not decide to replace or repair, the Contractor agrees to credit the contract price or pay the Government, as directed by the Contracting Officer, the least of—
21 added, 37 removed
(4)
(4) For task order and delivery order contracts, the Contractor's share of the loss shall be the lesser of $100,000 or twenty percent of the combined total price or total estimated cost of those orders issued to date to which the clause applies.
(4)
(4) The costs incurred by the Contractor for its share of the loss and for insuring against that loss are unallowable costs, including but not limited to—
17 added, 25 removed
(5)
(5) The costs incurred by the Contractor for its share of the loss and for insuring against that loss are unallowable costs, including but not limited to -
(5)
(5) The Contracting Officer will make an equitable adjustment for expenditures made in performing the obligations under this paragraph (g).
29 added, 41 removed
(6)
(6) Is sustained while the aircraft is being worked on and is a direct result of the work unless such damage, loss, or destruction would be covered by insurance which would have been maintained by the Contractor, but for the Government's assumption of risk.
(6)
(6) The notice of revocation does not relieve the Contractor of its obligation to comply with all other provisions of this clause, including the combined regulation/instruction entitled "Contractor's Flight and Ground Operations."
15 added, 38 removed
(7)
(7) Operation means operations and tests of the aircraft and its installed equipment, accessories, and power plants, while the aircraft is in the open or in motion. The term does not apply to aircraft on any production line or in flight.
(7)
(7) Any disputes regarding the Contracting Officer's notice of revocation shall be subject to FAR clause 52.233-1, Disputes.
35 added, 2 removed
(b)
(b) Combined regulation/instruction. The Contractor shall be bound by the operating procedures contained in the combined regulation/instruction entitled "Contractor's Flight and Ground Operations" (Air Force Instruction 10-220, Army Regulation 95-20, NAVAIR Instruction 3710.1 (Series), Coast Guard Instruction M13020.3, and Defense Contract Management Agency Instruction 8210.1) in effect on the date of contract award.
(b)
(b) Combined regulation/instruction. The Contractor shall be bound by the operating procedures contained in the combined regulation/instruction entitled "Contractor's Flight and Ground Operations" (Air Force Instruction 10-220, Army Regulation 95-20, NAVAIR Instruction 3710.1 (Series), Coast Guard Instruction M13020.3 (Series), and Defense Contract Management Agency Instruction 8210-1 (Series) in effect on the date of contract award. Compliance with the combined regulation/instruction is required from the time of contract award throughout the period of performance of the contract, regardless of the Government's assumption of risk under the contract.
5 added, 58 removed
(c)
(c) Government as self-insurer. Subject to the conditions in paragraph (d) of this clause, the Government self-insures and assumes the risk of damage to, or loss or destruction of aircraft "in the open," during "operation," and in "flight," except as may be specifically provided in the Schedule as an exception to this clause. The Contractor shall not be liable to the Government for such damage, loss, or destruction beyond the Contractor's share of loss amount under the Government's self-insurance.
(c)
(c) Government as self-insurer. The Government self-insures and assumes the risk of damage to, or loss or destruction of, covered aircraft subject to the following conditions:
20 added, 47 removed
(d)
(d) Conditions for Government's self-insurance. The Government's assumption of risk for aircraft in the open shall continue unless the Contracting Officer finds that the Contractor has failed to comply with paragraph (b) of this clause, or that the aircraft is in the open under unreasonable conditions, and the Contractor fails to take prompt corrective action.
(d)
(d) Exclusions from the Government's assumption of risk. The Government's assumption of risk under this clause shall not extend to damage, loss, or destruction of covered aircraft which—
1 added, 19 removed
(e)
(e) Exclusions from the Government's assumption of risk. The Government's assumption of risk shall not extend to damage, loss, or destruction of aircraft which -
(e)
(e) Revoking the Government's assumption of risk.
52 added, 26 removed
(f)
(f) Contractor's share of loss and Contractor's deductible under the Government's self-insurance. (1) The Contractor assumes the risk of loss and shall be responsible for the Contractor's share of loss under the Government's self-insurance. That share is the lesser of -
(f)
(f) Contractor's exclusion of insurance costs. The Contractor warrants that the contract price does not and will not include, except as may be authorized in this clause, any charge or contingency reserve for insurance (including the Contractor's share of loss) covering damage, loss, or destruction of covered aircraft when the risk has been assumed by the Government, even if the assumption may be terminated for covered aircraft.
5 added, 91 removed
(g)
(g) Subcontractor possession or control. The Contractor shall not be relieved from liability for damage, loss, or destruction of aircraft while such aircraft is in the possession or control of its subcontractors, except to the extent that the subcontract, with the written approval of the Contracting Officer, provides for relief from each liability. In the absence of approval, the subcontract shall contain provisions requiring the return of aircraft in as good condition as when received, except for reasonable wear and tear or for the utilization of the property in accordance with the provisions of this contract.
(g)
(g) Procedures in the event of damage, loss, or destruction.
1 added, 76 removed
(h)
(h) Contractor's exclusion of insurance costs. The Contractor warrants that the contract price does not and will not include, except as may be authorized in this clause, any charge or contingency reserve for insurance covering damage, loss, or destruction of aircraft while in the open, during operation, or in flight when the risk has been assumed by the Government, including the Contractor share of loss in this clause, even if the assumption may be terminated for aircraft in the open.
(h)
(h) Contractor's share of loss.
53 added, 23 removed
(j)
(j) Loss prior to delivery. (1) If prior to delivery and acceptance by the Government, aircraft is damaged, lost, or destroyed and the Government assumed the risk, the Government shall either -
(j)
(j) Liability to third parties. Unless the flight and crewmembers have been approved in writing by the GFR, the Contractor shall not be reimbursed for liability to third parties for loss or damage to property or for death or bodily injury caused by covered aircraft during flight, even if the Government has accepted such liability under any other provisions of the contract.
1 added, 28 removed
(A)
(A) It would have cost the Contractor to complete the aircraft (or any work to be performed on the aircraft) together with anticipated profit on uncompleted work; and
(A)
[Removed]
1 added, 16 removed
(B)
(B) Would be the value of the damaged aircraft or any salvage retained by the Contractor.
(B)
[Removed]
19 added, 95 removed
(k)
(k) Reimbursement from a third party. In the event the Contractor is reimbursed or compensated by a third party for damage, loss, or destruction of aircraft and has also been compensated by the Government, the Contractor shall equitably reimburse the Government. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for damage, loss, or destruction. Upon the request of the Contracting Officer or authorized representative, the Contractor shall at Government expense furnish to the Government all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment or subrogation) in obtaining recovery.
(k)
(k) Subcontracts. The Contractor shall incorporate the requirements of this clause, including this paragraph (k), in subcontracts to include subcontracts for commercial products and commercial services, except—
1 added, 83 removed
(l)
(l) Government acceptance of liability. To the extent the Government has accepted such liability under other provisions of this contract, the Contractor shall not be reimbursed for liability to third persons for loss or damage to property or for death or bodily injury caused by aircraft during flight unless the flight crew members previously have been approved for this flight in writing by the Government Flight Representative, who has been authorized in accordance with the combined regulation entitled "Contractor's Flight and Ground Operations".
(l)
[Removed]
1 added, 21 removed
(m)
(m) Subcontracts. The Contractor shall incorporate the requirements of this clause, including this paragraph (m), in all subcontracts. (End of clause)
(m)
[Removed]
DEC 2016 December 22, 2016 SUBSTANTIVE
Earliest version available from the eCFR

Active Class Deviations

DFARS RFO Implementation (Part 31) Add clause 252.228-7001
MODIFIED
DFARS RFO Implementation (Part 28) Add clause 252.228-7001
MODIFIED
Use with AI assistant
Copy a link and prompt for use with Gemini or another AI assistant.