- 2026-O0019 — DFARS RFO Implementation (Part 36)
252.236-7008 Contract prices—bidding schedules. As prescribed in 236.570(b)(6), use the following provision: Contract Prices—Bidding Schedules (DEC 1991) (a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for— (1) Furnishing all plant, labor, equipment, appliances, and materials; and (2) Performing all operations required to complete the work in conformity with the drawings and specifications. (b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule. (End of provision)
The prescription shown below is from the codified eCFR. The Revolutionary FAR Overhaul relocates this clause's prescription as follows:
-
236.570→236.101-71(prescriptive text also revised)
See the deviation memorandum for the current prescription authority.
View deviation: 2026-O0019 →R-DFARS Prescription Source
This clause is prescribed in the R-DFARS by the following deviation:
-
2026-O0019
— DFARS RFO Implementation (Part 36)
(DFARS Part 236)
Add clause 252.236-7008
236.570(b)
(1) 252.236-7002, Obstruction of Navigable Waterways, when the contract will involve work near or on navigable waterways.
(2) When the head of the contracting activity has approved use of a separate bid item for mobilization and preparatory work, use either -
(i) 252.236-7003, Payment for Mobilization and Preparatory Work. Use this clause for major construction contracts that require - (A) Major or special items of plant and equipment; or (B) Large stockpiles of material which are in excess of the type, kind, and quantity which would be normal for a contractor qualified to undertake the work; or
(ii) 252.236-7004, Payment for Mobilization and Demobilization. Use this clause for contracts involving major mobilization expense, or plant equipment and material (other than the situations covered in paragraph (b)(2)(i) of this section) made necessary by the location or nature of the work. (A) Generally, allocate 60 percent of the lump sum price in paragraph (a) of the clause to the cost of mobilization. (B) Vary this percentage to reflect the circumstances of the particular contract, but in no event should mobilization exceed 80 percent of the payment item.
(3) 252.236-7005, Airfield Safety Precautions, when construction will be performed on or near airfields.
(4) 252.236-7006, Cost Limitation, if the solicitation's bid schedule contains one or more items subject to statutory cost limitations, and if a waiver has not been granted (FAR 36.205).
(5) 252.236-7007, Additive or Deductive Items, if the procedures in 236.213 are being used.
(6) 252.236-7008, Contract Prices - Bidding Schedule, if the contract will contain only unit prices for some items.
Regulatory Stack
The layers of regulation that govern this clause, from the FAR prescription through agency-specific supplements and any active deviations.
R-DFARS
R-DFARS Prescription
Per Deviation 2026-O0019 (DFARS Part 236)
DFARS
DFARS Supplement (eCFR)
⚠ May be superseded by RFO
236.570(b)
(1) 252.236-7002, Obstruction of Navigable Waterways, when the contract will involve work near or on navigable waterways.
(2) When the head of the contracting activity has approved use of a separate bid item for mobilization and preparatory work, use either -
(i) 252.236-7003, Payment for Mobilization and Preparatory Work. Use this clause for major construction contracts that require - (A) Major or special items of plant and equipment; or (B) Large stockpiles of material which are in excess of the type, kind, and quantity which would be normal for a contractor qualified to undertake the work; or
(ii) 252.236-7004, Payment for Mobilization and Demobilization. Use this clause for contracts involving major mobilization expense, or plant equipment and material (other than the situations covered in paragraph (b)(2)(i) of this section) made necessary by the location or nature of the work. (A) Generally, allocate 60 percent of the lump sum price in paragraph (a) of the clause to the cost of mobilization. (B) Vary this percentage to reflect the circumstances of the particular contract, but in no event should mobilization exceed 80 percent of the payment item.
(3) 252.236-7005, Airfield Safety Precautions, when construction will be performed on or near airfields.
(4) 252.236-7006, Cost Limitation, if the solicitation's bid schedule contains one or more items subject to statutory cost limitations, and if a waiver has not been granted (FAR 36.205).
(5) 252.236-7007, Additive or Deductive Items, if the procedures in 236.213 are being used.
(6) 252.236-7008, Contract Prices - Bidding Schedule, if the contract will contain only unit prices for some items.
Version History
Version history is sourced from the codified eCFR. Changes published only as class deviations or by the Revolutionary FAR Overhaul do not appear here until they are incorporated into the eCFR. For RFO-driven changes see the RFO Version tab and any active deviations cited above.
No version history available from eCFR.