The corresponding FAR Part 4 and DFARS Part 204 have been overhauled under the RFO.
PGI replacement text is provided in the RFO deviation attachment.
View FAR Part 4
Current Content
(1) Include the contracting officer's telephone number and, when available, e-mail/Internet address on contracts and modifications.
(2) The contracting officer may sign bilateral modifications of a letter contract before signature by the contractor.
Change History
| Detected | Type | Summary |
|---|---|---|
| detected 2026-04-17 | PGI_MODIFIED | PGI 204.101 updated: 2 lines added, 1 lines removed |
View diff--- previous +++ current @@ -1 +1,2 @@ -Follow the procedures at PGI 204.101 for signature of contract documents.+(1) Include the contracting officer's telephone number and, when available, e-mail/Internet address on contracts and modifications. +(2) The contracting officer may sign bilateral modifications of a letter contract before signature by the contractor. |
||