The corresponding FAR Part 14 and DFARS Part 214 have been overhauled under the RFO.
PGI replacement text is provided in the RFO deviation attachment.
View FAR Part 14
Current Content
(1) The contracting officer shall make the written determinations required by FAR 14.404-1(c) and (e)(1).
(2) If only one offer is received, follow the procedures at 215.371 , in lieu of the procedures at FAR 14.404-1(f).
Change History
| Detected | Type | Summary |
|---|---|---|
| detected 2026-04-17 | PGI_MODIFIED | PGI 214.404-1 updated: 2 lines added, 4 lines removed |
View diff--- previous +++ current @@ -1,4 +1,2 @@ -(1) The contracting officer shall make the written determinations required by FAR 14.404-1(c) and (e)(1). - (2) If only one offer is received, follow the procedures at - 215.371 - , in lieu of the procedures at FAR 14.404-1(f).+(1) The contracting officer shall make the written determinations required by FAR 14.404-1(c) and (e)(1). +(2) If only one offer is received, follow the procedures at 215.371, in lieu of the procedures at FAR 14.404-1(f). |
||