This clause is marked [Reserved] under the Revolutionary FAR Overhaul (Deviation 2026-O0036). It no longer applies to contracts using the RFO model.
View deviation details252.227-7033 Rights in shop drawings. As prescribed in 227.7107-(1)(c), use the following clause: Rights in Shop Drawings (APR 1966) (a) Shop drawings for construction means drawings, submitted to the Government by the Construction Contractor, subcontractor or any lower-tier subcontractor pursuant to a construction contract, showing in detail (i) the proposed fabrication and assembly of structural elements and (ii) the installation (i.e., form, fit, and attachment details) of materials or equipment. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract. (b) This clause, including this paragraph (b), shall be included in all subcontracts hereunder at any tier. (End of clause) [56 FR 36479, July 31, 1991, as amended at 60 FR 33505, June 28, 1995]
The prescription shown below is from the codified eCFR. Under the RFO, the prescribing section may have been revised, relocated or reserved. See the deviation memorandum for the current prescription authority.
View deviation: 2026-O0036 →Regulatory Stack
The layers of regulation that govern this clause, from the FAR prescription through agency-specific supplements and any active deviations.
R-DFARS
R-DFARS Prescription
Per Deviation 2026-O0036 (DFARS Part 227)
Version History
Version history is sourced from the codified eCFR. Changes published only as class deviations or by the Revolutionary FAR Overhaul do not appear here until they are incorporated into the eCFR. For RFO-driven changes see the RFO Version tab and any active deviations cited above.