The Revolutionary FAR Overhaul has published a revised version of this clause. The RFO version supersedes the eCFR text below for contracts using the RFO model; see the RFO deviation for applicability.
52.219-16 Liquidated Damages—Subcontracting Plan.
As prescribed in 19.708(b)(2), insert the following clause:
Liquidated Damages—Subcontracting Plan (SEP 2021)
(a)
Failure to make a good faith effort to comply with the subcontracting plan,
as used in this clause, means a willful or intentional failure to perform in accordance with the requirements of the subcontracting plan approved under the clause in this contract entitled "Small Business Subcontracting Plan," or willful or intentional action to frustrate the plan.
(b) Performance shall be measured by applying the percentage goals to the total actual subcontracting dollars or, if a commercial plan is involved, to the pro rata share of actual subcontracting dollars attributable to Government contracts covered by the commercial plan. If, at contract completion or, in the case of a commercial plan, at the close of the fiscal year for which the plan is applicable, the Contractor has failed to meet its subcontracting goals and the Contracting Officer decides in accordance with paragraph (c) of this clause that the Contractor failed to make a good faith effort to comply with its subcontracting plan (see 19.705-7), established in accordance with the clause in this contract entitled "Small Business Subcontracting Plan," the Contractor shall pay the Government liquidated damages in an amount stated. The amount of probable damages attributable to the Contractor's failure to comply shall be an amount equal to the actual dollar amount by which the Contractor failed to achieve each subcontract goal.
(c) Before the Contracting Officer makes a final decision that the Contractor has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have been made and to discuss the matter. Failure to respond to the notice may be taken as an admission that no valid explanation exists. If, after consideration of all the pertinent data, the Contracting Officer finds that the Contractor failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer shall issue a final decision to that effect and require that the Contractor pay the Government liquidated damages as provided in paragraph (b) of this clause.
(d) With respect to commercial plans, the Contracting Officer who approved the plan will perform the functions of the Contracting Officer under this clause on behalf of all agencies with contracts covered by the commercial plan.
(e) The Contractor shall have the right of appeal, under the clause in this contract entitled Disputes, from any final decision of the Contracting Officer.
(f) Liquidated damages shall be in addition to any other remedies that the Government may have.
(End of clause)
[54 FR 30710, July 21, 1989, as amended at 60 FR 48267, Sept. 18, 1995; 63 FR 34068, June 22, 1998; 63 FR 70277, Dec. 18, 1998; 86 FR 44255, Aug. 11, 2021]
RFO
Prescription superseded under the RFO
The prescription shown below is from the codified eCFR. The Revolutionary FAR Overhaul relocates this clause's prescription as follows:
19.705-7 → 12.205(prescriptive text also revised)
19.705-7 → 19.109(prescriptive text also revised)
19.708 → 19.302-1(prescriptive text also revised)
See the deviation memorandum for the current prescription authority.
This clause is prescribed in the R-DFARS by the following deviation:
2026-O0037
— DFARS RFO Implementation (Part 19)
(DFARS Part 219)
Add clause 52.219-16
19.708(b)
(b) (1) Insert the clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer subcontracting possibilities, are expected to exceed $900,000 ($2 million for construction of any public facility), and are required to include the clause at 52.219-8, Utilization of Small Business Concerns, unless the acquisition is set aside or is to be accomplished under the 8(a) program. When-
(i) Contracting by sealed bidding rather than by negotiation, the contracting officer shall use the clause with its Alternate I;
(ii) Contracting by negotiation, and subcontracting plans are required with initial proposals as provided for in 19.705-2(d), the contracting officer shall use the clause with its Alternate II;
(iii) The contract action will not be reported in the Federal Procurement Data System pursuant to 4.606(c)(5), or (c)(6), the contracting officer shall use the clause with its Alternate III; or
(iv) Incorporating a subcontracting plan due to a modification as provided for in 19.702(a)(1)(iii), the contracting officer shall use the clause with its Alternate IV.
(2) Insert the clause at 52.219-16, Liquidated Damages-Subcontracting Plan, in all solicitations and contracts containing the clause at 52.219-9, Small Business Subcontracting Plan, or the clause with its Alternate I, II, III, or IV.
DFARS Supplementary Guidance
219.708
(b)(1)(A) Use the basic, alternate I, or alternate II clause at 252.219-7003 , Small Business Subcontracting Plan (DoD Contracts), in solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial products and commercial services, that contain the clause at FAR 52.219-9, Small Business Subcontracting Plan. (1) Use the basic clause at 252.219-7003, when using the basic, alternate I, or alternate II of FAR 52.219-9. (2) Use the alternate I clause at 252.219-7003, when using Alternate III of FAR 52.219-9. (3) Use the alternate II clause at 252.219-7003 when using the Demonstration Project described at 226.72. (B) In contracts with contractors that have comprehensive subcontracting plans approved under the Test Program described in 219.702-70 , including contracts using FAR part 12 procedures for the acquisition of commercial products and commercial services, use the clause at 252.219-7004 , Small Business Subcontracting Plan (Test Program), instead of the clauses at 252.219-7003 , Small Business Subcontracting Plan (DoD Contracts), FAR 52.219-9, Small Business Subcontracting Plan, and FAR 52.219-16, Liquidated Damages--Subcontracting Plan. (2) In contracts with contractors that have comprehensive subcontracting plans approved under the Test Program described in 219.702-70, do not use the clause at FAR 52.219-16, Liquidated Damages-Subcontracting Plan. (c)(1) Do not use the clause at FAR 52.219-10, Incentive Subcontracting Program, in contracts with contractors that have comprehensive subcontracting plans approved under the Test Program described in 219.702-70.
Prescription data sourced from eCFR as of 2026-06-10 03:16 UTC.
Cross-references within the prescription are not resolved automatically.
Regulatory Stack
The layers of regulation that govern this clause, from the FAR prescription through agency-specific supplements and any active deviations.
RFORFO VersionOverhauled clause text
The Revolutionary FAR Overhaul publishes a revised version of this clause. See the RFO Version tab for the controlling authority under the RFO model.
FARFAR Prescription⚠ May be superseded by RFO19.708(b)
(b) (1) Insert the clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer subcontracting possibilities, are expected to exceed $900,000 ($2 million for construction of any public facility), and are required to include the clause at 52.219-8, Utilization of Small Business Concerns, unless the acquisition is set aside or is to be accomplished under the 8(a) program. When-
(i) Contracting by sealed bidding rather than by negotiation, the contracting officer shall use the clause with its Alternate I;
(ii) Contracting by negotiation, and subcontracting plans are required with initial proposals as provided for in 19.705-2(d), the contracting officer shall use the clause with its Alternate II;
(iii) The contract action will not be reported in the Federal Procurement Data System pursuant to 4.606(c)(5), or (c)(6), the contracting officer shall use the clause with its Alternate III; or
(iv) Incorporating a subcontracting plan due to a modification as provided for in 19.702(a)(1)(iii), the contracting officer shall use the clause with its Alternate IV.
(2) Insert the clause at 52.219-16, Liquidated Damages-Subcontracting Plan, in all solicitations and contracts containing the clause at 52.219-9, Small Business Subcontracting Plan, or the clause with its Alternate I, II, III, or IV.
DFARSDFARS Supplement (eCFR)⚠ May be superseded by RFO219.708
(b)(1)(A) Use the basic, alternate I, or alternate II clause at 252.219-7003 , Small Business Subcontracting Plan (DoD Contracts), in solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial products and commercial services, that contain the clause at FAR 52.219-9, Small Business Subcontracting Plan. (1) Use the basic clause at 252.219-7003, when using the basic, alternate I, or alternate II of FAR 52.219-9. (2) Use the alternate I clause at 252.219-7003, when using Alternate III of FAR 52.219-9. (3) Use the alternate II clause at 252.219-7003 when using the Demonstration Project described at 226.72. (B) In contracts with contractors that have comprehensive subcontracting plans approved under the Test Program described in 219.702-70 , including contracts using FAR part 12 procedures for the acquisition of commercial products and commercial services, use the clause at 252.219-7004 , Small Business Subcontracting Plan (Test Program), instead of the clauses at 252.219-7003 , Small Business Subcontracting Plan (DoD Contracts), FAR 52.219-9, Small Business Subcontracting Plan, and FAR 52.219-16, Liquidated Damages--Subcontracting Plan. (2) In contracts with contractors that have comprehensive subcontracting plans approved under the Test Program described in 219.702-70, do not use the clause at FAR 52.219-16, Liquidated Damages-Subcontracting Plan. (c)(1) Do not use the clause at FAR 52.219-10, Incentive Subcontracting Program, in contracts with contractors that have comprehensive subcontracting plans approved under the Test Program described in 219.702-70.
Version history is sourced from the codified eCFR. Changes published only as class deviations or by the Revolutionary FAR Overhaul do not appear here until they are incorporated into the eCFR. For RFO-driven changes see the RFO Version tab and any active deviations cited above.
2 versions tracked from 2021-08-11 to 2021-09-10.
SEP 2021September 10, 2021CURRENT
Removed in this version
Added in this version
Unchanged
AUG 2021 (previous)
SEP 2021 (current)
(a)
(a) Failure to make a good faith effort to comply with the subcontracting plan, as used in this clause, means a willful or intentional failure to perform in accordance with the requirements of the subcontracting plan approved under the clause in this contract entitled "Small Business Subcontracting Plan," or willful or intentional action to frustrate the plan.
(a)
(a) Failure to make a good faith effort to comply with the subcontracting plan, as used in this clause, means a willful or intentional failure to perform in accordance with the requirements of the subcontracting plan approved under the clause in this contract entitled "Small Business Subcontracting Plan," or willful or intentional action to frustrate the plan.
3 added, 1 removed
(b)
(b) Performance shall be measured by applying the percentage goals to the total actual subcontracting dollars or, if a commercial plan is involved, to the pro rata share of actual subcontracting dollars attributable to Government contracts covered by the commercial plan. If, at contract completion or, in the case of a commercial plan, at the close of the fiscal year for which the plan is applicable, the Contractor has failed to meet its subcontracting goals and the Contracting Officer decides in accordance with paragraph (c) of this clause that the Contractor failed to make a good faith effort to comply with its subcontracting plan, established in accordance with the clause in this contract entitled "Small Business Subcontracting Plan," the Contractor shall pay the Government liquidated damages in an amount stated. The amount of probable damages attributable to the Contractor's failure to comply shall be an amount equal to the actual dollar amount by which the Contractor failed to achieve each subcontract goal.
(b)
(b) Performance shall be measured by applying the percentage goals to the total actual subcontracting dollars or, if a commercial plan is involved, to the pro rata share of actual subcontracting dollars attributable to Government contracts covered by the commercial plan. If, at contract completion or, in the case of a commercial plan, at the close of the fiscal year for which the plan is applicable, the Contractor has failed to meet its subcontracting goals and the Contracting Officer decides in accordance with paragraph (c) of this clause that the Contractor failed to make a good faith effort to comply with its subcontracting plan (see 19.705-7), established in accordance with the clause in this contract entitled "Small Business Subcontracting Plan," the Contractor shall pay the Government liquidated damages in an amount stated. The amount of probable damages attributable to the Contractor's failure to comply shall be an amount equal to the actual dollar amount by which the Contractor failed to achieve each subcontract goal.
(c)
(c) Before the Contracting Officer makes a final decision that the Contractor has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have been made and to discuss the matter. Failure to respond to the notice may be taken as an admission that no valid explanation exists. If, after consideration of all the pertinent data, the Contracting Officer finds that the Contractor failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer shall issue a final decision to that effect and require that the Contractor pay the Government liquidated damages as provided in paragraph (b) of this clause.
(c)
(c) Before the Contracting Officer makes a final decision that the Contractor has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have been made and to discuss the matter. Failure to respond to the notice may be taken as an admission that no valid explanation exists. If, after consideration of all the pertinent data, the Contracting Officer finds that the Contractor failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer shall issue a final decision to that effect and require that the Contractor pay the Government liquidated damages as provided in paragraph (b) of this clause.
(d)
(d) With respect to commercial plans, the Contracting Officer who approved the plan will perform the functions of the Contracting Officer under this clause on behalf of all agencies with contracts covered by the commercial plan.
(d)
(d) With respect to commercial plans, the Contracting Officer who approved the plan will perform the functions of the Contracting Officer under this clause on behalf of all agencies with contracts covered by the commercial plan.
(e)
(e) The Contractor shall have the right of appeal, under the clause in this contract entitled Disputes, from any final decision of the Contracting Officer.
(e)
(e) The Contractor shall have the right of appeal, under the clause in this contract entitled Disputes, from any final decision of the Contracting Officer.
(f)
(f) Liquidated damages shall be in addition to any other remedies that the Government may have.
(End of clause)
(f)
(f) Liquidated damages shall be in addition to any other remedies that the Government may have.
(End of clause)
AUG 2021August 11, 2021SUBSTANTIVE
Earliest version available from the eCFR
RFO Version
Comparison of the codified eCFR text against the Revolutionary FAR Overhaul revision. Highlights show additions (green) and deletions (red, struck through).
Clause Text
Substantive changes. The RFO version differs materially from the eCFR text.
eCFR (codified)
RFO (implemented)
Unchanged
52.219-16 Liquidated Damages-Subcontracting Plan.
eCFR (codified)
RFO (implemented)
3 added, 1 removed
As prescribed in 19.708(b)(2), insert the following clause:
As prescribed in 19.109(e)(2)(ii) and 19.302-1(b)(2), insert the following clause:
3 added, 3 removed
Liquidated Damages—Subcontracting Plan (SEP 2021)
Liquidated Damages-Subcontracting Plan (Deviation Date)
134 added, 32 removed
(a)
(a) Failure to make a good faith effort to comply with the subcontracting plan, as used in this clause, means a willful or intentional failure to perform in accordance with the requirements of the subcontracting plan approved under the clause in this contract entitled "Small Business Subcontracting Plan," or willful or intentional action to frustrate the plan.
(a)
(a) The Government will measure performance by applying the percentage goals to the total actual subcontracting dollars, or, if a commercial plan is involved, to the pro rata share of actual subcontracting dollars attributable to Government contracts covered by the commercial plan. If, at contract completion or, in the case of a commercial plan, at the close of the fiscal year for which the plan is applicable, the Contractor has failed to meet its subcontracting goals and the Contracting Officer decides in accordance with paragraph (b) of this clause that the Contractor failed to make a good faith effort to comply with its subcontracting plan, established in accordance with the clause in this contract entitled “Small Business Subcontracting Plan,” the Contractor shall pay the Government liquidated damages in a stated amount. The amount of probable damages attributable to the Contractor's failure to comply shall equal the actual dollar amount by which the Contractor failed to achieve each subcontract goal.
94 added, 127 removed
(b)
(b) Performance shall be measured by applying the percentage goals to the total actual subcontracting dollars or, if a commercial plan is involved, to the pro rata share of actual subcontracting dollars attributable to Government contracts covered by the commercial plan. If, at contract completion or, in the case of a commercial plan, at the close of the fiscal year for which the plan is applicable, the Contractor has failed to meet its subcontracting goals and the Contracting Officer decides in accordance with paragraph (c) of this clause that the Contractor failed to make a good faith effort to comply with its subcontracting plan (see 19.705-7), established in accordance with the clause in this contract entitled "Small Business Subcontracting Plan," the Contractor shall pay the Government liquidated damages in an amount stated. The amount of probable damages attributable to the Contractor's failure to comply shall be an amount equal to the actual dollar amount by which the Contractor failed to achieve each subcontract goal.
(b)
(b) Before the Contracting Officer makes a final decision that the Contractor has failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate the good faith efforts it made and to discuss the matter. The Contracting Officer may take failure to respond to the notice as an admission that no valid explanation exists. If, after consideration of all the pertinent data, the Contracting Officer finds that the Contractor failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer will issue a final decision to that effect and require that the Contractor pay the Government liquidated damages as provided in paragraph (a) of this clause.
25 added, 113 removed
(c)
(c) Before the Contracting Officer makes a final decision that the Contractor has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have been made and to discuss the matter. Failure to respond to the notice may be taken as an admission that no valid explanation exists. If, after consideration of all the pertinent data, the Contracting Officer finds that the Contractor failed to make a good faith effort to comply with the subcontracting plan, the Contracting Officer shall issue a final decision to that effect and require that the Contractor pay the Government liquidated damages as provided in paragraph (b) of this clause.
(c)
(c) With respect to commercial plans, the Contracting Officer who approved the plan will perform the functions of the Contracting Officer under this clause on behalf of all agencies with contracts covered by the commercial plan.
17 added, 29 removed
(d)
(d) With respect to commercial plans, the Contracting Officer who approved the plan will perform the functions of the Contracting Officer under this clause on behalf of all agencies with contracts covered by the commercial plan.
(d)
(d) The Contractor has the right of appeal, under the clause in this contract entitled, Disputes, from any final decision of the Contracting Officer.
14 added, 23 removed
(e)
(e) The Contractor shall have the right of appeal, under the clause in this contract entitled Disputes, from any final decision of the Contracting Officer.
(e)
(e) Liquidated damages shall be in addition to any other remedies that the Government may have.
16 removed
(f)
(f) Liquidated damages shall be in addition to any other remedies that the Government may have.
(f)
(End of clause)
(End of clause)
33 removed
[54 FR 30710, July 21, 1989, as amended at 60 FR 48267, Sept. 18, 1995; 63 FR 34068, June 22, 1998; 63 FR 70277, Dec. 18, 1998; 86 FR 44255, Aug. 11, 2021]
(b) (1) Insert the clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer subcontracting possibilities, are expected to exceed $900,000 ($2 million for construction of any public facility), and are required to include the clause at 52.219-8, Utilization of Small Business Concerns, unless the acquisition is set aside or is to be accomplished under the 8(a) program. When-
(b)
(ii) Insert the clause at 52.219-16, Liquidated Damages—Subcontracting Plan, in all solicitations and contracts containing the clause at 52.219-9, Small Business Subcontracting Plan, or the clause with its Alternate I or II.
20 removed
(i)
(i) Contracting by sealed bidding rather than by negotiation, the contracting officer shall use the clause with its Alternate I;
(i)
28 removed
(ii)
(ii) Contracting by negotiation, and subcontracting plans are required with initial proposals as provided for in 19.705-2(d), the contracting officer shall use the clause with its Alternate II;
(ii)
31 removed
(iii)
(iii) The contract action will not be reported in the Federal Procurement Data System pursuant to 4.606(c)(5), or (c)(6), the contracting officer shall use the clause with its Alternate III; or
(iii)
25 removed
(iv)
(iv) Incorporating a subcontracting plan due to a modification as provided for in 19.702(a)(1)(iii), the contracting officer shall use the clause with its Alternate IV.
(iv)
34 removed
(2)
(2) Insert the clause at 52.219-16, Liquidated Damages-Subcontracting Plan, in all solicitations and contracts containing the clause at 52.219-9, Small Business Subcontracting Plan, or the clause with its Alternate I, II, III, or IV.