Superseded.
This section was republished by Class Deviation
2026-O0047, which directs contracting officers to
use the deviated text instead of the codified text below.
View the deviated PGI 247.270-2
Current Content
(a) Because conditions vary at different ports, and sometimes within the same port it is not practical to develop standard technical provisions covering all phases of stevedoring operations.
(b) When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.
Change History
| Detected | Type | Summary |
|---|---|---|
| detected 2026-08-09 | PGI_ADDED | R-DFARS PGI 247.270-2 added by class deviation 2026-O0047 |