This text comes from the Word attachment to class deviation 2026-O0041, not from acquisition.gov. The deviation memo directs contracting officers to use it in place of the codified PGI. The source attachment linked below is authoritative.

Text

(a) The following are factors to take into consideration for granting a waiver:

(1) The energy supply system is physically incapable of segregating Russian Federation energy from non-Russian Federation energy.

(2) The installation can only obtain the necessary energy from its current supplier without the unaffordable expense of constructing new supply lines.

(3) The price of requiring the supplier to segregate the energy is unaffordable and would result in the installation being unable to perform its mission within its budget authority.

(4) Consideration, by the requiring activity, of installation energy and security resilience has been taken into account (e.g., on-site sources of energy and fuel resupply would allow the installation to continue to perform its mission even with disruption of Russian Federation-sourced energy, the installation has addressed energy resilience and security risks and vulnerabilities, etc.).

(b) The head of the contracting activity must submit to the congressional defense

committees a notice of the waiver with a copy to DPCAP, Contract Policy, via email at

osd.pentagon.ousd-a-s.mbx.dpc-cp@mail.mil, at least 14 days before the award of an energy contract on the basis of an approved waiver. The notification must include a copy of the waiver. Include a copy of the approved waiver in the contract file.

Sources: Deviation attachment (.docx) · Codified PGI 225.7019-3